Natchitoches Parish · issues
Civic issues
Topics getting the most attention in Natchitoches Parish public meetings, ranked by how frequently they come up.
In-house oil sand / pug mill proposal
Public Works wants to buy a ~$346,000 pug mill to make oil sand in-house, saying it could cut the cost of fixing dirt roads roughly in half versus contractor work. The council wants to see how the Collins Road test holds up through winter first.
Speed limit reductions on parish roads
The council finalized 15 mph limits on Holman Loop, Pasture Road, and Ben Gellette Road over dust and child-safety concerns, and introduced the same for Independence Street.
$660,000 CDBG grant and Brickyard overpass planning
The parish is applying for the State's Community Development Block Grant program for 2026 and 2026/2027.
State appropriations for roads and facilities (CEAs)
Residents from Ralph Street and Hwy 3191 begged the council for lasting road repairs, describing potholes that reappear days after gravel patches and a failing culvert. The council explained the parish has 800 miles of road and only enough budget to overlay a fraction each year, and said the parish president sets priorities. A proposal to spend $110,000 on Williams Avenue drew objections because it moves $10,000 out of the road aggregate budget.
Patrick Road speed limit reduction
A proposed ordinance would cut the speed limit on Patrick Road from 35 to 25 mph for safety. It was introduced and will come back for action later.
Seven road overlays awaiting approval clarification
President Salter has seven road overlays ready with bids in hand, but they stalled over whether they're 'capital improvements' requiring council approval under the Home Rule Charter. The council and the president agreed to work out whether the projects qualify and bring clarity next month.
Felise Lacaze Road abandonment dispute
The council overrode the parish president's veto of Ordinance 018-2026, which dealt with abandonment procedures not being followed for Felise Lacaze Road. The road's status on the parish maintenance system stays tangled up in this fight.
Felise Lacaze Road abandonment rescinded
The council pulled back its road abandonment after learning a landowner who bought 420 acres never got the required notice — and the road is his only way in. A property owner's access and proper legal procedure were both at stake.
Allen Buller Road condition and safety
A resident described a road degraded from asphalt to dust, SB 2 dust causing health worries, and 911 response concerns with Highway 487 closed. Public works promised to send graders and remove the material.
Julia Ann Drive road deterioration
A Julia Ann Drive family says their 40-year-old road is falling apart, and that gravel-and-dirt patching just washes away and damages vehicles. They're pushing the parish to seek Cane River Waterway Commission funds for a proper overlay.
Levy Taylor Road returned to parish system
A half-mile stretch abandoned in 1993 is being brought back so a resident in failing health can receive home health care visits. Making the road passable is estimated at about $8,000.
Blanchard Road and Clark Road project funding
Because the Blanchard Road project got state appropriations with no local match required, the parish can move the match money it had saved over to fully fund the Clark Road project.
Federal RAISE/BUILD transportation grant applications
The parish will chase two federal grants — a planning grant for a master transportation plan and a capital grant for road overlays and equipment — with a possible 100% federal share due to the parish's persistent-poverty, rural designation. Applications are due February 24, 2026.
Red Rock Road removal tabled
A plan to remove 26,755 feet of Red Rock Road from the parish road system was postponed while the parish works with the Public Service Commission and Postal Service on phone-line and mail-route issues for residents there.